Trusted by 500+ businesses across 15+ countries, Hebei Dongman’s HOWO Titan Tow Truck is engineered for demanding industrial environments. Built with a 15-year legacy of heavy-duty customization, this model combines unmatched load capacity (10-ton rear axle) and terrain adaptability (216mm reinforced beam) for mining, construction, and logistics fleets. Partnered with industry leaders like FAW Jiefang and Dongfeng Motor, we deliver ISO-certified reliability at the lowest market price.
Key Features :
🔧 2080mm Wide Operator Cab
Ergonomic design with air seats, folding sleeper, and climate control for 24/7 crew comfort.
⚡ Weichai 170HP Engine & Fast 8-Speed Gearbox
Fuel-efficient power with 4.875 speed ratio for steep inclines and heavy payloads.
🛡️ 216mm Double-Layer Reinforced Beam
High-altitude factory-tested durability to withstand 20%+ overload scenarios.
🚚 3800mm Extended Wheelbase
Stable 2.3m widened chassis for safer towing on uneven roads.
🛞 825 Steel Wire Tires
Puncture-resistant construction for 50% longer lifespan in rocky terrain.
🌐 Custom OEM Solutions
Tailored modifications (flip plate, telescopic arms) for specialized fleet needs.
Technical Specifications Table:
| Parameter | Specification |
|---|---|
| Wheelbase | 3800mm |
| Rear Axle Capacity | 10-ton |
| Tire Type | 825 Steel Wire (Original) |
| Frame Material | High-Strength Alloy Steel |
| Certifications | ISO 9001, CE, Custom OEM Compliant |
| Engine | Weichai 170HP Diesel |
Why Choose Us?
✅ Price Advantage: 15% lower cost vs. Foton/Cummins models with identical specs.
✅ Flexible MOQ: Bulk orders from 5 units (vs. industry-standard 10+).
✅ 5-Year Warranty: Extended coverage on chassis and critical components.
✅ Global Shipping: Pre-cleared logistics to 30+ countries with 4–6 week lead times.
FAQ:
Q: What’s the production lead time?
A: 4–6 weeks with real-time QC updates.
Q: Do you accept small bulk orders?
A: Yes! MOQ starts at 5 units with tiered discounts.
Q: How is quality verified?
A: 3-stage inspection (pre-assembly, load-testing, pre-shipment) + optional third-party audits.
Q: Payment terms?
A: T/T, L/C, or flexible milestone payments.