🔧 Heavy-Duty Dongman Tow Trucks for Demanding Recovery Operations
ISO 9001 & CE Certified | 15 Years of Engineering Excellence
Trusted by logistics fleets across China and Southeast Asia, Dongman’s Foton Aoling Jieyun tow trucks combine rugged durability with intelligent design. Engineered for overload scenarios and extreme conditions, these recovery vehicles keep your operations moving – even when others fail.
✅ Certified for Global Use | 🚚 1-Week Customization
| Feature | Your Benefit | |
|---|---|---|
| 🔋 | Yunnei 151HP Turbo Engine | 400 Nm torque for steep inclines + 15% better fuel efficiency vs. standard models |
| 🛡️ | Double-Layer Reinforced Chassis | 30% higher torsion resistance for 5-ton payloads (Ideal for construction machinery recovery) |
| 🎛️ | Dual Transmission Options | Choose 6-gear WLY or 8-gear FAST for terrain adaptability (Mountainous vs. urban routes) |
| 🚛 | 3.6M Extended Wheelbase | 2.26M ultra-wide track width enhances stability during heavy-load towing |
| 🔧 | 700R16 Steel-Belted Tires | 8-lug axle hubs + puncture-resistant design for mining site operations |
| 🌡️ | Smart Cabin Ergonomics | Vibration-damped seat + multi-function steering wheel reduces driver fatigue by 40% |
| Category | Details |
|---|---|
| Chassis | Foton Aoling Jieyun Mid-Cab |
| Engine | Yunnei DW15 (151HP/400Nm) |
| Transmission | WLY 6-speed / FAST 8-speed (Optional) |
| Axle Ratio | 4.333 Rear Axle (5T Capacity) |
| Fuel Tank | 120L Corrosion-Resistant Steel |
| Certifications | ISO 9001, CE, China Compulsory Certification |
| Dongman | Generic Brands | |
|---|---|---|
| Pricing | 12-15% lower for same specs | Hidden upgrade fees |
| Customization | 7-day prototype turnaround | 4+ weeks minimum |
| Warranty | 3-year drivetrain coverage | 1-year limited |
| MOQ | 1 unit (Sample orders welcome) | 5+ units required |
Q: What’s the lead time for EU shipments?
A: 35 days door-to-door with our EXW/FOB contracts + pre-shipment video inspection.
Q: Can you match our company’s branding?
A: Yes! OEM paint schemes/logos available (Provide vector files with order).
Q: How do you ensure quality control?
A: Triple-check system: Component laser measurement → Load simulation test → 50km road trial.
Q: Payment terms for first order?
A: T/T 30% deposit + 70% against BL copy. Established buyers qualify for LC terms.