Hebei Dongman Special Vehicle Manufacturing Co., Ltd.
Previous
Next

18M Insulated Hybrid Aerial Platform for Live-Line Work | 50kV Certified | CE/ISO Compliant

  • 50kV FRP Insulation
  • IEC 61477 Live-Line Certified
  • 230kg Dual-Worker Capacity
  • ±100° Platform Rotation
  • Hybrid Power: 70° Slope Climbing
  • Zero Emission Mode
  • 10-Year Chassis Warranty
  • 15% Bulk Order Discounts

Description

Trusted by utility providers in 12+ countries, our CE/ISO-certified 18M insulated aerial platform redefines safety for live-line operations up to 50kV. Engineered with military-grade FRP buckets and hybrid boom articulation, it eliminates downtime from power shutdowns while conquering complex terrain. Backed by 15 years of specialized high-voltage vehicle engineering, we deliver time-tested solutions that protect both crews and critical infrastructure.


Key Features

⚡ 50kV Live-Line Safety
Fully insulated FRP bucket with 0.6m pre-extension section enables 10kV live work without retracting booms – 40% faster task completion.

🔄 Hybrid Articulated Reach
Combines telescopic + articulated boom movements to bypass obstacles (e.g., trees, structures) with 12m horizontal outreach at full height.

🎮 3D Precision Control
Multi-axis hydraulic joystick enables millimeter-accurate positioning – ideal for transformer repairs or fragile cable installations.

🏋️ 230kg Dual-Worker Capacity
Reinforced platform carries two technicians + tools simultaneously, rated for 200kg at maximum extension.

🌱 Eco Hybrid Power
Zero-emission electric mode for substations | Diesel power for remote sites with 70° slope climbing capability.

🛡️ Auto-Stabilizing Outriggers
H-type legs with terrain sensors maintain <1° tilt even on 15% gradients – 3x faster setup than competitors.


Technical Specifications

ParameterDetail
Max Working Height18 meters (59 ft)
Insulation Rating50kV bucket / 10kV pre-extension
Horizontal Reach12 meters (39 ft)
Platform Rotation±100° with 0.6m lift function
Power SystemDiesel-Electric Hybrid
Frame MaterialQSTE700TM high-strength steel
CertificationsCE, ISO 9001, IEC 61477 (Live-Line)

Why Choose Us?

✅ Price Leadership
20% lower TCO vs. Terex/Time competitors – MOQ 1 unit with 15% bulk discounts for 5+ orders.

✅ Rapid Customization
Modify boom lengths, add tool trays, or integrate voltage detectors – ready in 10 working days.

✅ Lifetime Structural Warranty
10-year chassis guarantee + 72hr emergency parts delivery via global couriers.

✅ Pre-Certified Shipments
Includes destination-country compliance kits (OSHA/BS EN 280/IEC) – ships worldwide in 18 days.


FAQ

Q: Can we test insulation performance onsite?
A: Yes! We provide third-party test videos or arrange live demonstrations at our facility.

Q: What payment methods do you accept?
A: T/T, LC, or Alibaba Trade Assurance with 20% deposit, balance pre-shipment.

Q: How do you ensure road legality?
A: Units include China Compulsory Certification (CCC) + export compliance documents.


GET A QUOTE

Hebei Dongman Special Vehicle Manufacturing Co., Ltd.

Quick Inquiry